Bathroom renovation: to start

The bathroom is a room with specific states: high humidity, temperature differences. That’s why making repairs in the restroom, you need to clearly plan the entire working process, to think about the sequence of steps to be achieved. In the following article, you will learn the way to start the fix in the bathroom and what kinds of work should be performed together with your hands. Step-by-step instructions for bathroom repair

Stage 1: Establishing a plan and deciding upon a layout solution.

Repair in the toilet can be of 2 types:

Begin repairs at the bathroom is to ascertain the design, inside. Think through to the last detail, what’s going to be the room, choose a colour. Pastel colors are traditional, as well as a mix of blue and blue, pink or cherry with beige.

Begin repairs at the toilet is to ascertain the design, interior design. Consider detail, what’s going to be the space, select a color. Pastel colours are considered traditional, in addition to a mixture of colors.

Next point is that the selection of facing material. Generally, finishing at the bathroom is performed with tile, porcelain tiles, mosaic, vinyl panels. Check the pipes, whether it has to be mended. If necessary, choose the right option. Proceed to the measuring work: measure all sides, figure out the area of the area. Based on these data, we mark the location of the plumbing fixtures.

Measure 2: the choice of sanitary fittings and substance for completing.

It’s very important to recognize that the purchase price of sanitary ware precedes the planning stage, and not vice versa. This usually means that first we create a design project, create a plan, then go to the store. Another point – you should specify the size of your favorite plumbing fixtures and examine the program, whether it matches.

It is important to understand that the cost of plumbing fittings is preceded by a preparation period, and not vice versa. This usually means that first we create a design project, make a plan, then go to the shop. Another one

As for stuff for finishing, it’s preferable to get them instantly for the whole repair cycle, and that you will not be distracted if something was missing. Do not forget about preparing the necessary tools.

Measure 3: dismantling plumbing and tiling.

Once all the preliminary work has been done, proceed to the beginning of the task process:

Measure 4: Cost of communications: pipes, electrical wiring.

Quite frequently in an old house, you ought to carefully inspect and replace not only the pipes that are in the bathroom itself, but also the principal riser, and on occasion the interfloor plumbing. What’s it worth doing so? Old pipes at any time may give a flow, and then the new fix will be emptied, it will call for additional investment to eliminate defects.